61189500L1-1F 4-1
Section 4
Installation
GENERAL
The first three tasks for installing and operating the MX410/MX412 are to unpack, inspect,
and install. Those tasks are detailed in this section of the manual, as well as information for
mounting the MX410/MX412 into an equipment rack or to a wall, making the proper connec-
tions to the front and rear panels, identifying the front panel indicators, and adding or
removing a Power Supply Unit (PSU).
NOTE
The PSU (P/N 1189501L1) is only available for the MX410. The
MX412 contains an internal power supply.
RECEIVING INSPECTION
Inspect the MX410/MX412 for any damage that might have occurred in shipment. If damage
is suspected, file a claim immediately with the carrier, keep the original packaging for damage
verification and/or returning the unit, and contact ADTRAN Customer Service. For warranty
information, refer to “Appendix A, Warranty”.
ADTRAN SHIPPING CONTENTS
After unpacking the MX410 or MX412, verify that the following items are present:
• MX410 and MX410 PSU
or
MX412
• Installation Hardware
– Blank PSU cover (P/N 1189502L1) - MX410 only
– Ground lug with nut and lock washer
– Wire-wrap post cover and screw
– Power connector
– Mounting brackets and screws for 19-inch rack or wall installation
– 23-inch mounting bracket adapter
Kommentare zu diesen Handbüchern