ADTRAN 1200214L1 Spezifikationen Seite 89

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 176
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 88
Chapter 7. Configuring the DCE Port
61200214L1-20 IQ Probe User Manual 7-7
DBU Call Order Number
This determines the order in which a list of backup locations will be dialed.
This applies only to auto DBU processes that are triggered by port failure.
If all DBU C
ALL
O
RDER
entries are set to N
ONE
, then the first entry with a
DBU P
HONE
N
UMBER
will be used.
CIR (Kbps)
Enter the CIR in kbps for the corresponding DLCI. The information is sup-
plied by your service provider and must be entered for each PVC to ensure
accuracy of statistical information.
Seq Num Checking (SEQ #)
Set to E
NABLE
only if there are IQ products on both ends of the PVC. When
enabled, the IQ Probe tags each frame with a sequence number which is
then used by the remote IQ device to detect lost packets. Lost packet
counts are given in the S
TATISTICS
menus.
Delay Measurement (PVC DELAY)
Set to E
NABLE
only if there are IQ products on both ends of the PVC. When
enabled, the IQ Probe periodically transmits a loopback frame to the re-
mote IQ device which is then returned to measure round trip delay of each
PVC. Minimum, maximum, and average delay measurements are given in
the S
TATISTICS
menus.
Stats Option (STATS OPT)
This option prioritizes PVCs for S
TATISTICS
counts. The IQ Probe tracks
statistics for a limited number of the PVCs that pass through. This number
is determined in the M
AX
PVC C
OUNT
field (see Maximum PVC Count
(MAX PVC COUNT) on page 7-5). The three choices for this field are de-
scribed below.
Auto
If set to A
UTO
, then statistics will be logged for this PVC if the M
AX
PVC
C
OUNT
has not been exceeded. The A
UTO
selection designates a PVC as sec-
ond priority to a PVC set to E
NABLED
.
Enabled
If set to E
NABLED
, then statistics will be logged for this PVC if the M
AX
PVC
C
OUNT
has not been exceeded. A PVC set to E
NABLED
is designated as a
higher priority than one set to A
UTO
.
Seitenansicht 88
1 2 ... 84 85 86 87 88 89 90 91 92 93 94 ... 175 176

Kommentare zu diesen Handbüchern

Keine Kommentare